Moving on to the gearbox.
Stripping and inspecting.
The box looks really good, so a clean of all the parts and change what needs changing only
Project: Mark's bits
Posted: July 07, 2011
Comments: 0 Comments
Front hub assembly rebuilt with drop spindles
Project: Mark's bits
Posted: July 07, 2011
Comments: 0 Comments
Moving on to the gearbox.
Stripping and inspecting.
The box looks really good, so a clean of all the parts and change what needs changing only
Project: Mark's bits
Posted: July 07, 2011
Comments: 0 Comments
Measuring and shimming the ‘C’ link into the hub
Project: Mark's bits
Posted: July 07, 2011
Comments: 0 Comments
Cleaning the 'C' link after reaming out the king pin bushes
Project: Mark's bits
Posted: July 07, 2011
Comments: 0 Comments

P.R Services Ltd
Dunlop Garage
London Road
Billericay
Essex, CM12 9HP
Company No. 04256834
England, UK
Tel: 01277 630099 or +44 (0)7000 356911
Fax +44 (0) 1277 630099
Design engineer Professor Dr. Ing. h.c. Ferdinand Porsche built each model from the inside out, every nut and bolt, every screw was engineered to ensure that each car had the capacity to run to perfection. We’re dedicated ...